PROJECT:
Keach Library – Robstown, Texas
MARKET:
Municipal
TYPE OF CONSTRUCTION:
Retrofit
PLATFORM/SYSTEM POINTS:
Niagara N4 – BACnet
112 points
PROJECT CHALLENGE:
Existing controls for multi-zone air handling unit and associated zones control systems were not functioning properly and operated erratically. Systems would not maintain required temperature setpoints and zones would not communicate back to controller.
PROJECT SOLUTION:
Installed new Honeywell Webs Spyder controllers for the multi-zones unit, 2 outside air units, 2 fan coil units and 16 zone. Created system and floorplan graphics which included engineering, programming and commissioning services. System is part of County wide supervisor building automation integration.